Richfield Wind Farm

Mercury was commissioned to carry out both civil and electrical work on the Richfield Wind Farm project in Wexford. The Project was an Engineer Procure and Construct Project (EPC). The scope was to design and construct the civil (roads, bases and substation) and electrical (MV and LV installation) installation of a 27MW Windfarm for Airtricity.

Wexford, Ireland

€6,059,386

  • 11 Months

  • Multidisciplinary
  • Electrical
  • Turnkey Construction