Poolbeg Power Station

This work involves supply and installation of fire detection and suppression systems and the manufacture, supply and installation of fire doors for  six transformers at ESB North Wall.

• Detection and suppression system
• Fire Proof Doors
• H.O.T. Transformers
• Pump house Transformers
• Gas Turbine

Dublin, Ireland

€1,000,000

  • 8 Months

  • Fire Protection