Enterprise Data Centres

LD10.2 Data Centre, London, UK

  • London,UK
  • 12 months
  • Confidential
  • €20,000,000

Mercury was awarded this contract after successfully completing previous projects with this repeat client in London.

The scope of work of this project included:

• The formation of a mezzanine floor slab across 50% of the existing open plan warehouse

• 4 3Mw data halls and associated switch rooms; above and below the mezzanine floor

• 4 new switch rooms forming Rope 1 of the electrical distribution network, compromising of HV cast retain transformers, LV input board, UPS and associated batteries and UPS output board

• The installation of new HV Switch rooms and distribution networks from the upgraded SSE 33/11KV substation

• The formation of a new external steel gantry to enable 6 2.5MVA HV generator sets and associated bulk fuel stores to be installed

• The installation of a processed treated water plant and associated water storage tanks, to provide 24-hour standby water supplies to the Jaeggi HDACs

• The chilled water distribution via carbon steel pipework in a ring configuration with risers dropping from the lid level to the lower floor voids

• The installation of water mist systems in all Data Halls and sprinklers in storage rooms.

This was a highly rewarding and challenging project of which Mercury successfully met all requirements.

This was a highly rewarding and challenging project of which Mercury successfully met all requirements.