{"id":16149,"date":"2024-11-26T06:46:11","date_gmt":"2024-11-26T06:46:11","guid":{"rendered":"https:\/\/www.mercuryeng.com\/?p=16149"},"modified":"2024-11-26T14:45:26","modified_gmt":"2024-11-26T14:45:26","slug":"mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements","status":"publish","type":"post","link":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/","title":{"rendered":"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements"},"content":{"rendered":"<p>Mercury, Europe\u2019s leading provider of data centre construction solutions, celebrated the completion and handover of Equinix\u2019s FR13 data centre in Frankfurt. The project features highly energy-efficient operations in line with our client\u2019s sustainability efforts. Located in our client\u2019s Frankfurt North-East campus, this data centre is located in a strategic business hub for local and global businesses, serving key industries such as banking, commerce, and telecommunications.<\/p>\n<p>FR13 covers 5,295 square metres of world-class white space and possesses a total IT power capacity of 7.75MWs, which is housed across two data halls over three floors. The Mercury team developed Stage 4 client design, delivering shell and core of the entire data centre and a state-of-the-art front of house facility, with a total internal floor area of approximately 9,540 metres squared.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16150 aligncenter\" src=\"\/wp-content\/uploads\/2024\/10\/FR13-exterior02-1000x714.jpg\" alt=\"\" width=\"700\" height=\"500\" srcset=\"https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-exterior02-1000x714.jpg 1000w, https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-exterior02-350x250.jpg 350w, https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-exterior02-700x500.jpg 700w, https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-exterior02.jpg 1400w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>FR13 has received LEED (Leadership in Energy and Environmental Design) certification and will be powered by 100% renewable energy. The project boasts a unique combination of architectural fa\u00e7ade finishes- Alucobond, Bris Soleil, and impressive living wall elements with over 17,000 individual plants, which showcases a commitment to sustainable living. The distinctive exterior incorporates planted trees, soft landscaping, a green roof and walls with a climbing plant system on two elevations, and five living wall segments. It also includes an economical irrigation system, which reduces excess water, encourages wildlife, and will offset the project\u2019s carbon footprint.<\/p>\n<p>Mercury was appointed as principal contractor. Over the course of the project, our dedicated and diverse team, hailing from 28 different countries, efficiently managed the installation of all critical equipment and executed the full range of CSA and MEP works, as well as commissioning of the project. The team ensured the vision of our client was delivered in line with the highest standards of safety, quality, and performance, through to handover. The project was delivered in line with Mercury\u2019s \u201cFinish Strong\u201d quality campaign and our industry leading WorkSafe | HomeSafe campaign which ensured all project team members showcased a powerful dedication to our safety ethos, driving a strong finish. The relentless efforts paid off, with the team maintaining an AFR (Accident Frequency Rate) of 0.00.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-16158\" src=\"\/wp-content\/uploads\/2024\/10\/FR13-interior01-350x234.jpg\" alt=\"\" width=\"700\" height=\"467\" srcset=\"https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-interior01-350x234.jpg 350w, https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-interior01-1000x667.jpg 1000w, https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-interior01-700x467.jpg 700w, https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-interior01.jpg 1400w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>Through the leadership of Rory O\u2019Brien, Managing Director; Tony Haughton, Business Unit Lead; Serkan Tashkan, Operations Manager; and Ciaran Evans, Project Manager, FR13 was delivered by our Critical Data Infrastructure division. This marks another successful collaboration between Mercury and our valued client Equinix, who we continue to closely work with on a number of key projects throughout Europe.<\/p>\n<p>Rory O\u2019Brien, Managing Director for Critical Data Infrastructures division commented, \u201cWe are proud to have delivered this cutting-edge data centre for Equinix in Frankfurt. At Mercury, we consistently go beyond to meet the challenges of the ever-growing market and commit to always delivering to our clients\u2019 requirements and vision. The skill, commitment, and dedication of our delivery teams enable us to deliver the vision of our clients with certainty. For the duration of the project, every member of our team on FR13 worked incredibly hard while maintaining an exceptional standard of safety day in, day out.\u201d He continued, \u201cSustainable development was also a major consideration on the project. Our team committed to delivering on our client\u2019s requirements in this state-of-the art project which works to address environmental needs.\u201d<\/p>\n<hr \/>\n<h4>DATA CENTRES<\/h4>\n<p>Mercury is Europe\u2019s most experienced Colocation Data Centre service provider. We go beyond to meet the challenges of the ever-growing market, always delivering to our clients\u2019 requirements and commitments. Over the last 20 years as a leading general contractor, our highly skilled international teams have successfully delivered data centres across 14 countries for some of the world\u2019s largest data centre companies. We design, build, plan, construct, and commission data centres using the highest levels of safety, quality, and delivery and manage the maintenance of facilities post-construction. Our cutting-edge construction methods mean we consistently deliver highly complex and specialised turnkey services on time, every time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mercury, Europe\u2019s leading provider of data centre construction solutions, celebrated the completion and handover of Equinix\u2019s FR13 data centre in Frankfurt. The project features highly energy-efficient operations in line with our client\u2019s sustainability efforts. Located in our client\u2019s Frankfurt North-East campus, this data centre is located in a strategic business hub for local and global [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":16156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,18],"class_list":["post-16149","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mercury-engineering","category-projects"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements - Mercury Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements - Mercury Engineering\" \/>\n<meta property=\"og:description\" content=\"Mercury, Europe\u2019s leading provider of data centre construction solutions, celebrated the completion and handover of Equinix\u2019s FR13 data centre in Frankfurt. The project features highly energy-efficient operations in line with our client\u2019s sustainability efforts. Located in our client\u2019s Frankfurt North-East campus, this data centre is located in a strategic business hub for local and global [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/\" \/>\n<meta property=\"og:site_name\" content=\"Mercury Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-26T06:46:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-26T14:45:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-exterior01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"788\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Orlagh Grandon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"Orlagh Grandon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/\"},\"author\":{\"name\":\"Orlagh Grandon\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/#\\\/schema\\\/person\\\/21fa1b3cd2bc5701698683250c041143\"},\"headline\":\"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements\",\"datePublished\":\"2024-11-26T06:46:11+00:00\",\"dateModified\":\"2024-11-26T14:45:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/\"},\"wordCount\":656,\"image\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FR13-exterior01.jpg\",\"articleSection\":[\"News\",\"Projects\"],\"inLanguage\":\"de-DE\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/\",\"url\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/\",\"name\":\"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements - Mercury Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FR13-exterior01.jpg\",\"datePublished\":\"2024-11-26T06:46:11+00:00\",\"dateModified\":\"2024-11-26T14:45:26+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/#\\\/schema\\\/person\\\/21fa1b3cd2bc5701698683250c041143\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#breadcrumb\"},\"inLanguage\":\"de-DE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de-DE\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FR13-exterior01.jpg\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/FR13-exterior01.jpg\",\"width\":1400,\"height\":788,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/2024\\\/11\\\/26\\\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/\",\"name\":\"Mercury Engineering\",\"description\":\"Ihre Vision, unsere Verpflichtung.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de-DE\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/#\\\/schema\\\/person\\\/21fa1b3cd2bc5701698683250c041143\",\"name\":\"Orlagh Grandon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de-DE\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f6a9e79ae1a280761991aec345d1702408508f29fbcf24c17ca726f004e3194d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f6a9e79ae1a280761991aec345d1702408508f29fbcf24c17ca726f004e3194d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f6a9e79ae1a280761991aec345d1702408508f29fbcf24c17ca726f004e3194d?s=96&d=mm&r=g\",\"caption\":\"Orlagh Grandon\"},\"url\":\"https:\\\/\\\/www.mercuryeng.com\\\/de\\\/author\\\/orlagh-grandon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements - Mercury Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/","og_locale":"de_DE","og_type":"article","og_title":"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements - Mercury Engineering","og_description":"Mercury, Europe\u2019s leading provider of data centre construction solutions, celebrated the completion and handover of Equinix\u2019s FR13 data centre in Frankfurt. The project features highly energy-efficient operations in line with our client\u2019s sustainability efforts. Located in our client\u2019s Frankfurt North-East campus, this data centre is located in a strategic business hub for local and global [&hellip;]","og_url":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/","og_site_name":"Mercury Engineering","article_published_time":"2024-11-26T06:46:11+00:00","article_modified_time":"2024-11-26T14:45:26+00:00","og_image":[{"width":1400,"height":788,"url":"https:\/\/www.mercuryeng.com\/wp-content\/uploads\/2024\/10\/FR13-exterior01.jpg","type":"image\/jpeg"}],"author":"Orlagh Grandon","twitter_card":"summary_large_image","twitter_misc":{"Verfasst von":"Orlagh Grandon","Gesch\u00e4tzte Lesezeit":"4 Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#article","isPartOf":{"@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/"},"author":{"name":"Orlagh Grandon","@id":"https:\/\/www.mercuryeng.com\/de\/#\/schema\/person\/21fa1b3cd2bc5701698683250c041143"},"headline":"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements","datePublished":"2024-11-26T06:46:11+00:00","dateModified":"2024-11-26T14:45:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/"},"wordCount":656,"image":{"@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2024\/10\/FR13-exterior01.jpg","articleSection":["News","Projects"],"inLanguage":"de-DE"},{"@type":"WebPage","@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/","url":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/","name":"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements - Mercury Engineering","isPartOf":{"@id":"https:\/\/www.mercuryeng.com\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#primaryimage"},"image":{"@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2024\/10\/FR13-exterior01.jpg","datePublished":"2024-11-26T06:46:11+00:00","dateModified":"2024-11-26T14:45:26+00:00","author":{"@id":"https:\/\/www.mercuryeng.com\/de\/#\/schema\/person\/21fa1b3cd2bc5701698683250c041143"},"breadcrumb":{"@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#breadcrumb"},"inLanguage":"de-DE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/"]}]},{"@type":"ImageObject","inLanguage":"de-DE","@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#primaryimage","url":"\/wp-content\/uploads\/2024\/10\/FR13-exterior01.jpg","contentUrl":"\/wp-content\/uploads\/2024\/10\/FR13-exterior01.jpg","width":1400,"height":788,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mercuryeng.com\/de\/2024\/11\/26\/mercury-successfully-delivers-equinixs-fr13-data-centre-with-impressive-sustainability-and-ehs-achievements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mercuryeng.com\/de\/"},{"@type":"ListItem","position":2,"name":"Mercury successfully delivers Equinix\u2019s FR13 data centre, with impressive sustainability and EHS achievements"}]},{"@type":"WebSite","@id":"https:\/\/www.mercuryeng.com\/de\/#website","url":"https:\/\/www.mercuryeng.com\/de\/","name":"Mercury Engineering","description":"Ihre Vision, unsere Verpflichtung.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mercuryeng.com\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de-DE"},{"@type":"Person","@id":"https:\/\/www.mercuryeng.com\/de\/#\/schema\/person\/21fa1b3cd2bc5701698683250c041143","name":"Orlagh Grandon","image":{"@type":"ImageObject","inLanguage":"de-DE","@id":"https:\/\/secure.gravatar.com\/avatar\/f6a9e79ae1a280761991aec345d1702408508f29fbcf24c17ca726f004e3194d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f6a9e79ae1a280761991aec345d1702408508f29fbcf24c17ca726f004e3194d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f6a9e79ae1a280761991aec345d1702408508f29fbcf24c17ca726f004e3194d?s=96&d=mm&r=g","caption":"Orlagh Grandon"},"url":"https:\/\/www.mercuryeng.com\/de\/author\/orlagh-grandon\/"}]}},"_links":{"self":[{"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/posts\/16149","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/comments?post=16149"}],"version-history":[{"count":4,"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/posts\/16149\/revisions"}],"predecessor-version":[{"id":17285,"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/posts\/16149\/revisions\/17285"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/media\/16156"}],"wp:attachment":[{"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/media?parent=16149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mercuryeng.com\/de\/wp-json\/wp\/v2\/categories?post=16149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}